Ernst & Young
Completion of full refurbishment to Ernst & Young's second floor office space in Southampton, based on architect designs. A complete modernisation of the area comprising tea-point, meeting rooms, partitioning, and glass doors. Also included new feature walls and new flooring throughout.
Project. Refurbishment of existing office space
Materials used. Office Partitions (System 8000 Double-Glazing with Flush Double-Glazed Doors), Tea Point, Plumbing, Electrical, Flooring, Suspended Ceilings, Plasterboard Bulkhead/Raft Ceiling Details, Feature Walls and Decorations
Budget. £110,000
Project duration. A lot of the works were carried out over a few weekends, with the office being empty for 2 weeks only to complete
Materials used. Office Partitions (System 8000 Double-Glazing with Flush Double-Glazed Doors), Tea Point, Plumbing, Electrical, Flooring, Suspended Ceilings, Plasterboard Bulkhead/Raft Ceiling Details, Feature Walls and Decorations
Budget. £110,000
Project duration. A lot of the works were carried out over a few weekends, with the office being empty for 2 weeks only to complete